12
STEP 7:
Insert two 3/4” x 1” BUSHINGS (36) to the ends of the PAD HOLDER ASSEMBLY (4). Insert the 1/2” x 3 1/4” SHAFT
(35) through the 3/4” x 1” BUSHINGS (36).
Position the PADHOLDER ASSEMBLY (4) onto the MAIN FRAME ASSEMBLY (1) as shown.
Secure the PADHOLDER ASSEMBLY (4) to the ROLLER CARRIAGE ASSEMBLY(D) using two M10 x 20mm
SCREWS (22) and two FLAT 3/8” WASHERS (19). Tighten the screws securely.