READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE INSTALLING FIXTURE
This fixture is intended for installation in accordance with the National Electrical Code and local regulations. To assure full compliance with local codes and regulations, check with your local electrical inspector before installation. To prevent electrical shock, turn off electricity at fuse box before proceeding.
Retain these instructions for maintenance reference.
INSTRUCTION SHEET NO.
IS:1104ICX
B1204 Page 2 of 2
For sloped ceilings:
•For 1131 and 1133 series sloped ceiling trims, Mounting Frame must be mounted with
2. |
|
Open hinged | MOUNTING BAR |
slightly to unlock). |
Open hinged KNOCK OUT to allow
Note: Wiring and connections must not be placed in JUNCTION
BOX in a manner which will interfere with the CLAMPS | |||
action to provide strain relief. | |||
SHEATHED CABLE | |||
Wire to SUPPLY LEADS. WHITE FIXTURE LEAD to NEUTRAL | (12 OR 14 GAUGE ONLY) |
| |
|
| ||
SUPPLY LEAD. BLACK FIXTURE LEAD to HOT (120V) SUPPLY |
|
| |
LEAD. BARE FIXTURE WIRE to SUPPLY GROUND. Use wirenuts |
|
| |
(local hardware item). Place all electrical connections in the |
|
| |
|
| ||
3. | HINGED KNOCK OUT |
|
Extend MOUNTING BAR to reach opposite joist and fasten in place. Adjust to desired position along MOUNTING BAR and lock in place using LOCKING SCREW.
CABLE CLAMP
JUNCTION BOX
4.CLOSE-IN (Fig. D)
Install plasterboard or other dry type ceiling. Hole in board can be cut either on the floor or after the board is secured to the ceiling using MOUNTING FRAME opening as cutting guide. Make sure
Note: When using 1116, 1117, 1117WH Trims, ceiling thickness should be 3/4” maximum.
5. AIRSEAL® INSTALLATION (optional)
Install a bead of silicone caulking compound between the ceiling opening and edge of HOUSING. Housings are tested in accordance with ASTM E 283 (max 2 cfm @ 75 pa) and comply with WSEC & MEC when installed as instructed.
LOCKING SCREW
DEFORM MATERIAL AT
ANY CORNER OF FRAME
FOR ADDITIONAL LOCK
IF NEEDED
6.SNAP-ON (Fig. E)
Important - Insert SOCKET CUP in neck of REFLECTOR making sure SPRING TABS fully engage into SLOTS in REFLECTOR.
7.PUSH-UP (Fig. F)
Push REFLECTOR TRIM straight up until it is tight against ceiling.
}SEE SEPARATE REFLECTOR TRIM INSTRUCTION SHEETS
U.S. AND FOREIGN PATENTS PENDING
®LIGHTOLIER a GENLYTE THOMAS company. 631 Airport Road, Fall River, MA 02720