All installations and services must be performed by qualified service personnel.

ON START-UP:

8.Have the heating system (and furnace) inspected and started by a qualified service person.

9.Set the room thermostat above room temperature.

10.Open all shutoff valves in the gas supply line.

4.Turn “on” the main power at the disconnecting switch and at the furnace power switch to start the inducer.

5.Follow the “BURNER OPERATION AND ADJUSTMENT” procedure in Section L.

40

Page 41
Image 41
Lodge Manufacturing GMD1-80N manual On START-UP