Contents

 

Testing Information

3

General Safety Precautions

3

Drafting

4

Negative Pressure Warning

4

Creosote

4

Ash Disposal

5

Fuel

5

Break-InPeriod

5

Paint Curing

5

Brick Installation

6

Required Clearances

7

Chimney Requirements

8

Installation Procedures-MasonryChimney

8

Installation Procedure - Factory-Built Zero Clearance Fireplaces

9

Fireplace Pre-InstallationPreparation

9

Insert Pre-InstallationPreparation

9

Chimney Liner Installation

10

Installing the Insert

10

Post Installation Checks

10

Operating Hints

11

Starting and Maintaining a Fire

12

Clean Glass

13

Operating Techniques and Hints

13

Getting the Most Out of Your Stove

13

Maximizing Your Stoves Overall Efficiency

14

Achieving Clean, Long Burns

14

Maintenance

15

Troubleshooting

16

Dos and Donts

17

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

Page 2
Image 2
Logitek Standard Elec. Cable Manufacturing C/A210 operation manual Contents