Makita EBH340U Shutdown, 200h, Operating time, operation, lubrication, rest, ponding P

Models: EBH340U

1 32
Download 32 pages 32.87 Kb
Page 27
Image 27
Operating time

Operating time

 

Before

After

Daily

 

 

 

Shutdown

Corres-

 

 

30h

50h

200h

 

 

operation

lubrication

(10h)

/rest

ponding P

Item

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Inspect/

￿

 

 

 

 

 

 

16

 

clean

 

 

 

 

 

 

Engine oil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Replace

 

 

 

 

￿*1

 

 

21

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tightening

Inspect

￿

 

 

 

 

 

 

24

parts (bolt, nut)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clean/

￿

 

 

 

 

 

 

￿

 

inspect

 

 

 

 

 

 

Fuel tank

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Drain fuel

 

 

 

 

 

 

￿*3

25

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Throttle lever

Check

 

￿

 

 

 

 

 

18

function

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Stop switch

Check

 

￿

 

 

 

 

 

18

function

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cutting blade

Inspect

￿

 

￿

 

 

 

 

15

 

 

 

 

 

 

 

 

 

 

Low-speed

Inspect/

 

 

￿

 

 

 

 

20

rotation

adjust

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Air cleaner

Clean

 

 

￿

 

 

 

 

23

 

 

 

 

 

 

 

 

 

 

Ignition plug

Inspect

 

 

￿

 

 

 

 

23

 

 

 

 

 

 

 

 

 

 

Cooling air

Clean/

 

 

￿

 

 

 

 

24

duct

inspect

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Inspect

 

 

￿

 

 

 

 

24

Fuel pipe

 

 

 

 

 

 

 

 

 

Replace

 

 

 

 

 

￿*2

 

￿

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gear-case

Refill

 

 

 

￿

 

 

 

23

grease

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fuel filter

Clean/

 

 

 

 

￿

 

 

24

 

replace

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clearance

 

 

 

 

 

 

 

 

 

between air

 

 

 

 

 

 

 

 

 

intake valve

Adjust

 

 

 

 

 

￿*2

 

￿

and air

 

 

 

 

 

 

 

 

 

discharge valve

 

 

 

 

 

 

 

 

 

Oil tube

Inspect

 

 

 

 

 

￿*2

 

 

 

 

 

 

 

 

 

 

 

 

Engine

 

 

 

 

 

 

￿*2

 

￿

overhaul

 

 

 

 

 

 

 

 

 

Carburetor

Drain fuel

 

 

 

 

 

 

￿*3

25

 

 

 

 

 

 

 

 

 

 

*1 Perform initial replacement after 20h operation.

*2 For the 200 operating hour inspection, request Authorized Service Agent or a machine shop. *3 After emptying the fuel tank, continue to run the engine and drain fuel in the carburetor.

27

Page 27
Image 27
Makita EBH340U instruction manual Shutdown, 200h, Operating time, operation, lubrication, rest, ponding P