| 30” | |
|
| Installation Instructions |
Material List | ||
Quantity |
| |
1 | Armaflex Insulation | 6’ x 2” ID x 3/8” wall thickness |
1 | Armaflex Insulation | 6’ x 3/4” ID x 3/8” wall |
| (used on evaporator inlet/outlet and dump valve drain line) | |
1 | Bulkhead Insulation Back | 9” x 30” x 3/4” |
1 | Bulkhead Insulation Back | 3” x 30” x 3/8” |
2 | Side Wall Insulation | 9” x 10” x 3/4” |
1 | Vacuum Formed Base with Insulation | 12 3/4” x 30” x 3/4" |
1 | Foam Gasket For Top Edge of Bin | 2’ x 3/4” x 1/4” |
1 | Tube Silicone Sealant Black | Used to seal base/bulkhead insulation |
1 | Tube Silicone Sealant White | Used to seal front edge of |
1 | Mylar Strip | 5” x 25” |
Additional materials required: caulk gun, 2” x 4” wood blocks, wire ties.
Preparation
1.Disconnect power from ice machine.
2.Remove front, top, and side panels.
3.Drain water from sump trough.
4.Ice machine must be thoroughly dried before the insulation can be installed. Use towels to dry bulkhead and base assembly.
Base Insulation Installation
1.Raise the ice machine above the bin. A high lift can be used or (two people required) lift front edge of ice machine and place wood blocks (2” x 4”) between ice machine and bin. Lifting one side of ice machine at a time, move wood blocks to center balance point of ice machine.
2.Slide
3.Add one layer of foam tape insulation from the front of the bin to the front of the base insulation on the left and right side.
2. Install
3. Add foam tape both sides.
Manitowoc Ice, Inc.
2110 South 26 Street, P.O. Box 1720, Manitowoc, WI | 8005493 |
Telephone | Sheet 1 of 3 |
Web Site - www.manitowocice.com | 06/02/00 |
4.Raise front of ice machine and position the wood blocks on edge (3 1/2” height). This will allow the top of the