Installation Step 2
Install the Header Bracket
You can attach the header bracket either to the wall above the garage door, or to the ceiling. Follow the instructions which will work best for your particular requirements.
Fasten the Header Bracket to the Wall
•Center the bracket on the vertical guideline with the bottom edge of the bracket on the horizontal line as shown (with the arrow pointing toward the ceiling).
•Mark either set of bracket holes (do not use the holes designated for ceiling mount). Drill 3/16" pilot holes and fasten the bracket securely to a structural support with the hardware provided.
Header
Wall
ONLY
MOUNT
CEILING
UP
Header
Bracket
Vertical | Wall | |
Mounting Holes | ||
Center | ||
| ||
Line |
| |
Lag Screws | CEILING MOUNT ONLY | |
|
UP
2x4 |
|
| |
Structural | Door |
| |
Support |
| ||
Spring | The nail hole is for positioning | ||
| |||
|
| ||
|
| only. You must use lag screws to | |
|
| mount the header bracket. | |
|
| Optional Wall | |
|
| Mounting Holes | |
| 2" |
|
|
|
|
|
|
|
|
| Garage |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Hardware Shown Actual Size |
|
|
| ||||||||||||||||||||||||||
|
|
|
|
|
|
|
| Door |
|
|
|
|
|
| ||||||||||||||||||||||||||
|
|
|
|
|
|
|
| |||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Highest |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Point of Travel |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
(of Garage Door) |
|
|
|
| Vertical |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
| Center Line |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Lag Screw |
|
|
| ||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
| |||||||||||||||||||||||||||||
|
|
|
|
|
|
|
| |||||||||||||||||||||||||||||||||
|
|
|
|
|
| |||||||||||||||||||||||||||||||||||
|
| Fasten the Header Bracket to the Ceiling |
|
|
|
•Extend the vertical guideline onto the ceiling as shown.
•Center the bracket on the vertical mark, no more than 6" from the wall. Make sure the arrow is pointing toward the wall. The bracket can be mounted flush against the ceiling when clearance is minimal.
•Mark holes designated for ceiling mount only. Drill 3/16" pilot holes and fasten the bracket securely to a structural support with the hardware provided.
Finished
Ceiling
Vertical
Center Line
Header
Bracket
UP
6" Maximum
Ceiling Mounting Holes
CEILING MOUNT ONLY
UP
The nail hole is for positioning only. You must use lag screws to mount
the header bracket.
Door
Spring
Garage
Door
Lag Screws
Header
Wall
Vertical
Center Line
9