Maytag MBL2556KES Connect to Refrigerator, Style, Complete the Installation, A B C D E

Models: MBL2556KES

1 44
Download 44 pages 5.58 Kb
Page 5
Image 5
Connect to Refrigerator

Connect to Refrigerator

Depending on your model, the water line may come down from the top or up from the bottom. Follow the connection instructions for your model.

Style 1

1.Remove plastic cap from water valve inlet port. Attach the copper tube to the valve inlet using a compression nut and sleeve as shown. Tighten the compression nut. Do not overtighten. Confirm copper tubing is secure by pulling on copper tubing.

2.Create a service loop with the copper tubing. Avoid kinks when coiling the copper tubing. Secure copper tubing to refrigerator cabinet with a “P” clamp.

A

B

C

D

E

A. Copper tubing

D. Compression sleeve

B. “P” clamp

E. Water valve inlet port

C. Compression nut

 

3.Turn on water supply to refrigerator and check for leaks. Correct any leaks.

Style 2

1.Create a service loop (minimum diameter of 2 ft [61 cm]) with the copper tubing. Avoid kinks when coiling the copper tubing.

2.Remove the plastic cap from water valve inlet port. Place a compression nut and sleeve on the copper tubing.

3.Insert the end of the copper tubing into the water valve inlet port. Shape tubing slightly so that the tubing feeds straight into the port to avoid kinks.

4.Slide the compression nut over the sleeve and screw into the water valve inlet port.

Style 1A

B

C

AComplete the InstallationD

A. Plastic water tubing

C. Compression nut

B. Sleeve

D. Copper tubing

5.Using an adjustable wrench, hold the nut on the plastic water line to keep it from moving. Then, with a second wrench turn the compression nut on the copper tubing counterclockwise to completely tighten. Do not overtighten.

 

A

 

B

 

C

 

D

 

E

A. Plastic water line

D. Copper tubing

B. Water valve inlet port

E. “P” clamp

C. Compression nut

 

6.Check connection by pulling on copper tubing. Attach copper tubing to refrigerator cabinet with a “P” clamp. Turn on water supply to refrigerator and check for leaks. Correct any leaks.

Complete the Installation

Manual backgroundWARNING

Electrical Shock Hazard

Plug into a grounded 3 prong outlet.

Do not remove ground prong.

Do not use an adapter.

Do not use an extension cord.

Failure to follow these instructions can result in death, fire, or electrical shock.

1.Plug into a grounded 3 prong outlet.

NOTE: Allow 24 hours to produce the first batch of ice. Discard the first three batches of ice produced. Allow 3 days to completely fill the ice container.

5

Page 5
Image 5
Maytag MBL2556KES Connect to Refrigerator, Style, Complete the Installation, A B C D E, Electrical Shock Hazard