14
New Arrival
notification.
Step 2
CERS – New Arrival notification (STEP 2)
This page is composed of three main sections.
VESSEL IDENTIFICATION
The first section initially displays the Vessel details as retrieved by the system.
ARRIVAL INFORMATION
The second section provides a form defining the details that should be entered in order to
record a new Arrival Notification. These fields are defined as:
Port of Arrival – Mandatory choice from the UK Port List
Port Berth – Optional Berth at which Vessel berths
Persons on Board – Mandatory number of people of board
E.T.A. – Mandatory date and time for Estimated Time of Arrival
E.T.D. – Optional date and time for Estimated Time of Departure
Last Port of Call – Optional choice from the Worldwide Port List
A.T.D. – Optional date and time for Actual Time of Departure from the Last Port of Call
The third section encapsulates Dangerous and Polluting Goods (DPG) notification which can
be added to the notification if the vessel is arring at a UK port from a departure port outside