1. Front bagger tube

2. Vinyl binding

 

5

 

0

 

9

1

2

0

 

2

3.

Spreader bars

3

4.

Retainer spring

 

5.

Vinyl binding

4

5

4

906 02

5

6.

Dump handle tube

6

7.

Clevis pin 10 x 44mm

 

8.

Retainer spring

 

7

9.

Cap

8

 

 

 

 

 

 

9

07

 

 

029

1.

Top Surfaces Even

 

6MM (1/4") - 9MM (3/8")

2.

Horizontal Adjustment Bracket

 

3.

Vertical Adjustment Bracket

1

4.

Bagger Latch

2

 

 

 

 

3

02967

4

2

To Assemble Bagger

Unfold bag by pivoting front bagger tube all the way forward and pressing the bottom vinyl binding onto the tube.

Inside the bag, install spreader bars and retainer springs onto pins on both sides of bag as shown.

Press the vinyl bindings onto the sides of front bagger tube.

Slide the bagger dump handle through the hole in the bagger top, install the clevis pin 10 x 44mm and secure with retainer spring.

Push cap over end of bagger dump handle.

NOTE: For future use, the clevis pin may be removed in order to use the handle to clear the chute in the event it has become clogged.

Bagger adjustment

For proper bag function and appearance, it may be nec- essary to adjust the bagger assembly. There should be 6mm (1/4")-9mm (3/8") gap between the bagger top and fender and the bagger top surface should be even with the top surface of the fender. To adjust bagger position:

Horizontal adjustment

Slightly loosen the nuts securing the bagger RH and LH horizontal adjustment brackets. Loosen only enough so the brackets keep their position, but allow them to be moved.

Move the brackets the amount forward or backward you wish the bag assembly to move. Retighten the nuts securely.

Vertical adjustment

Slightly loosen the nuts securing the vertical adjustment brackets. Loosen only enough so the brackets keep their position, but allow them to be moved.

Move the brackets the amount up or down you wish the bag assembly to move. Retighten the nuts securely.

Reinstall the bagger assembly and check the bagger to fender fit. If necessary, repeat the procedure until proper fit is attained.

After proper fit is attained, remove bagger from tractor and install bagger latch (4) to tractor back plate as shown. Tighten securely.

Install and carefully lower bagger to actuate latch.

Measure distance between bagger and latch as shown. If distance is not 10mm - 16mm carefully remove bagger and repeat vertical adjustment as needed.

0298 3

10MM (7/16") - 16MM (5/8")

4

To convert to bagging, mulching or discharge See "Section 5" of this manual.

25

Page 25
Image 25
McCulloch P13597RB, LZ12597RB, M13597RB To Assemble Bagger, Bagger adjustment, Horizontal adjustment, Vertical adjustment