Merco Savory CG-30 Before Installation, For Your Safety, Installation Instructions

Models: CG-30

1 4
Download 4 pages 11.76 Kb
Page 2
Image 2
BEFORE INSTALLATION

BEFORE INSTALLATION

NOTE: Upon receipt of this unit, immediately unpack and inspect for possible concealed shipping damage. If unit is found to be damaged, save all packing materials and contact your delivery carrier within 5 days. Refer to “Shipping Damage Instructions” enclosed for detailed instructions. Failure to follow these instructions will negate Merco/Savory’s or your ability to file claims and receive compensation for shipping damage.

FOR YOUR SAFETY

Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance

NOTE: Instructions to be followed in the event the operator smells gas, should be posted in a prominent location. This information can be obtained by consulting your local gas supplier.

WARNING: Improper installation, adjustment, alteration service or maintenance can cause property damage, injury or death. Read the Installation & Operation and Maintenance instructions thoroughly before installation or servicing this equipment.

INSTALLATION INSTRUCTIONS

Install the CG-30 toaster in the most convenient location for ease of cleaning, maintenance and general operation. Avoid installing in locations with drafts, close proximity to grease or vapor-producing appliances or other high ambient heat equipment. For cafeteria or waiter type operation, the toaster should be set for rear delivery, with the receiving tray facing the traffic flow. Front Delivery: Insert delivery chute through front opening with lipped end held. Push delivery chute rear up and back until notches fall over chute pins. Rear Delivery: Insert delivery chute through rear opening with lipped end held. Push delivery chute rear up and back until notches fall over chute pins.

Electrical Grounding Instructions: This appliance is equipped with a three-prong (grounding plug) for your protection against shock hazard and should be plugged directly into a properly grounded three-prong receptacle. Do not cut or remove the grounding prong from this plug.

IMPORTANT

Toaster should be installed in an area free and clear of combustibles. The area should have no obstructions to the flow of combustion and ventilation air. Provisions should be made for adequate air supply in the room where the toaster is installed. Maintain adequate clearance for air openings into the combustion chamber.

MINIMUM CLEARANCE FROM COMBUSTIBLE AND NONCOMBUSTIBLE CONSTRUCTION IS 6” FROM EACH SIDE AND 6” FROM REAR OF UNIT.

SUITABLE FOR INSTALLATION ON COMBUSTIBLE FLOORS.

A gas pressure regulator is provided for use with both natural gas and propane gas. It is recommended that a flexible metal connector be installed between the toaster and the gas supply line. The connector should comply with the latest edition of the Standard for Connectors for Moveable Gas Appliance ANSI Z21.69 and that adequate means must be provided to limit the movement of the unit without depending on the connector and any quick disconnect device or its associated piping to limit the unit movement. The connector should be of the appropriate length and equipped with a quick disconnect coupling containing a feasible link (Savory Part #25209). This will permit portability for ease of cleaning, adjust- ments and service. Minimum inlet pressure for natural gas is 5” w.c. Minimum inlet pressure for propane gas is 11” w.c. Electrical grounding of the installed toaster is required. The CG-30 toaster is factory supplied with a 6’ cord and NEMA5- 15P plug. Electrical power required to operate the conveyor motor and the burner control valves is only 40.2 watts which is readily available at most electrical outlets. This toaster must be electrically grounded in accordance with local codes, or in the absence of local codes, with the latest edition of the National Electrical Code ANSI/NFPA 70 or the CSA C-22.2.

NOTE: Wiring diagram is permanently attached to the inner surface of the removable right side panel.

2

Page 2
Image 2
Merco Savory CG-30 operation manual Before Installation, For Your Safety, Installation Instructions