BEFORE INSTALLATION
NOTE: Upon receipt of this unit, immediately unpack and inspect for possible concealed shipping damage. If unit is found to be damaged, save all packing materials and contact your delivery carrier within 5 days. Refer to “Shipping Damage Instructions” enclosed for detailed instructions. Failure to follow these instructions will negate Merco/Savory’s or your ability to file claims and receive compensation for shipping damage.
FOR YOUR SAFETY
Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance
NOTE: Instructions to be followed in the event the operator smells gas, should be posted in a prominent location. This information can be obtained by consulting your local gas supplier.
WARNING: Improper installation, adjustment, alteration service or maintenance can cause property damage, injury or death. Read the Installation & Operation and Maintenance instructions thoroughly before installation or servicing this equipment.
INSTALLATION INSTRUCTIONS
Install the
Electrical Grounding Instructions: This appliance is equipped with a
IMPORTANT
Toaster should be installed in an area free and clear of combustibles. The area should have no obstructions to the flow of combustion and ventilation air. Provisions should be made for adequate air supply in the room where the toaster is installed. Maintain adequate clearance for air openings into the combustion chamber.
MINIMUM CLEARANCE FROM COMBUSTIBLE AND NONCOMBUSTIBLE CONSTRUCTION IS 6” FROM EACH SIDE AND 6” FROM REAR OF UNIT.
SUITABLE FOR INSTALLATION ON COMBUSTIBLE FLOORS.
A gas pressure regulator is provided for use with both natural gas and propane gas. It is recommended that a flexible metal connector be installed between the toaster and the gas supply line. The connector should comply with the latest edition of the Standard for Connectors for Moveable Gas Appliance ANSI Z21.69 and that adequate means must be provided to limit the movement of the unit without depending on the connector and any quick disconnect device or its associated piping to limit the unit movement. The connector should be of the appropriate length and equipped with a quick disconnect coupling containing a feasible link (Savory Part #25209). This will permit portability for ease of cleaning, adjust- ments and service. Minimum inlet pressure for natural gas is 5” w.c. Minimum inlet pressure for propane gas is 11” w.c. Electrical grounding of the installed toaster is required. The
NOTE: Wiring diagram is permanently attached to the inner surface of the removable right side panel.
2