SEQUENCE OF OPERATIONS
On the POP2/4 toaster, the sequence of operations is separate but identical for both left and right toasting slots. Power is permanently supplied to the power switch. Depressing the toast arm closes the power switch which supplies voltage to the control board. The control board energizes an electro magnet which holds the toast arm in a down position. The control board also supplies power to the heating elements. Adjusting the Light/Dark knob will change the amount of time that the elements are energized and the toast arm is held in the down position. At the end of the cooking cycle, the electro magnet and the heating elements and
4