FIGURE 11 HOT AIR DUCT CLEARANCE REQUIREMENTS

FIGURE 11 HOT AIR DUCT CLEARANCE REQUIREMENTS

FIGURE 12 PARALLEL ADD-ON INSTALLATION

FIGURE 13 CENTRAL ADD-ON INSTALLATION

 

 

WOODCHUCK FINAL ASSEMBLY

OPTIONAL SHAKER GRATE INSTALLATION FOR MODEL 526

1.Remove standard grates from firebox. Assemble com- plete shaker grate kit outside of unit. Figure 16.

2.Assemble the left front bar (different from right front bar, has shorter extension shaft at front) to a rear bar. Slide a gear onto the front shaft.

3.Set this assembly into the front frame first and then into the rear frame.