DURINGPRESSURETESTINGNOTETHEFOLLOWING:

ENGLISH

SECTION 2 - INSTALLATION

V. GAS SUPPLY

CAUTION

DURINGPRESSURETESTINGNOTETHEFOLLOWING:

1.The oven and its individual shutoff valve must be discon- nected from the gas supply piping system during any pressure testing of that system at test pressure in excess of 1/2 psi (3.45 kPa).

2.The oven must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressure equal to or less than 1/2 psi (3.45 kPa).

3.If incoming pressure is over 14" W.C. (35mbar), a separate regulator MUST be installed in the line BEFORE the individual shutoff valve for the oven.

WARNING: To prevent damage to the control valve regu- lator during initial turn- on of gas, it is very important to open the manual shutoff valve very slowly.

After the initial gas turn-on, the manual shutoff valve must remain open except during pressure testing as outlined in the above steps or when necessary during service maintenance.

A.Gas Utility Rough-In Recommendations

The following gas system specifications are STRONGLY RECOMMENDED. Deviating from these recommendations may affect the baking performance of the oven.

Gas Meter - 650 cfh (307l/min) meter

Gas Line

DEDICATED LINE from the gas meter to the oven

2" (50.8mm) pipe for natural gas

1-1/2" (38.1mm) pipe for propane

Maximum length: 200' (61m). Each 90° elbow equals 7' (2.13m) of pipe.

B.Connection

Check the oven’s gas supply requirements before making the gas utility connection. Gas supply requirement are listed on the oven’s serial plate and in Table 1-4. Gas Orifice and Pressure Specifications (in Section 1, Description).

Check the serial plate to determine the type of gas (Propane or Natural) to be used with the oven.

Refer to the instructions in the gas hose package (included in the Installation Kit) before connecting the gas line. One gas line connection method is shown in Figure 2-18; however, compliance with the applicable standards and regulations is mandatory.

Inlet, regulated, and pilot gas pressure readings can be taken using a digital tube manometer at the tap location shown in Figure 2-19. Figure 2-19 shows the burner assembly and Figure 2-21 shows the gas valve.

NOTE: The installation must conform with local codes or in the absence of local codes, with the National Fuel Gas Code, ANSI Z223.1-latest edition.

Certain safety code requirements exist for the installation of gas ovens; refer to the beginning of Section 2 for a list of the installation standards. In addition, because the oven is equipped with casters, the gas line connection shall be made with a connector that complies with the Standard for Connectors for Movable Gas

Appliances, ANSI Z21.69 (in U.S.A.), as well as a quick-disconnect device that complies with the Standard for Quick-Disconnect Devices for Use With Gas Fuel, ANSI Z21.41 (in U.S.A.).

C.Gas Conversion

Where permitted by local and national codes, it is possible to convert ovens from natural to propane gas, or from propane to natural gas. Use the appropriate Middleby Gas Conversion Kit for the specific oven model.

CAUTION: The terms of the oven’s warranty require all start- ups, conversions and service work to be per- formed by a Middleby Authorized Service Agent.

D.PS536 Propane Conversion

Two items have to be changed, to change the oven to LP:

1.Replace main orifices.

2.Adjust main gas regulator per instructions below.

Disconnect the manifold union closest to the main burner, and remove the manifold assembly (four screws). Slide out the manifold assembly (leaving the ignition and sense wires con- nected). Replace the main orifices.

Replace the main orifices on the manifold assemblies with the LP units, and replace the manifold assembly. Reconnect the union.

E.Adjusting the Maximum Pressure Setting

1.Disconnect pressure feedback connection (if appcable).

2.Connect a suitable pressure gauge to pipe line or to outlet pressure tap of gas control concerned, to mea- sure burner pressure (measuring point must be as near to burner as possible).

3.Make sure that the appliance is in operation and the Moduplus® coil is energized with maximum current.

4.If maximum rate pressure needs adjustment, use an 8 mm wrench to turn adjustment screw for maximum pressure setting (clockwise to increase or counter-clockwise to de- crease pressure), until the desired maximum outlet pres- sure is obtained.

Figure 2-15 - Flexible Gas Hose Installation

1/2" gas

3/4"-1/2"

 

pipe nipple

 

gas pipe

 

 

To Gas

 

reducer

 

Supply

 

 

 

 

Pipe

 

3/4" gas

 

 

pipe nipple

 

1/2" gas line

 

 

tee with

90°

 

pressure tap

 

 

Elbow

 

Full-Flow

Gas

Shutoff

Valve

 

Flexible

Individual gas

Quick-

connection for

Gas Hose

each oven

disconnect

 

 

cavity

device

 

 

 

14