Miele DA210-3 Installation, Bolt the flange firmly to the ceiling us- ing the four M6 nuts

Models: DA210-3

1 36
Download 36 pages 10.77 Kb
Page 30
Image 30
^Bolt the flange firmly to the ceiling us- ing the four M6 nuts.

Installation

^Bolt the flange firmly to the ceiling us- ing the four M6 nuts.

^Shorten the power cable as much as possible and attach it to the terminal block inside the chimney. See "Elec- trical data".

Before connecting the appliance read the "Warning and Safety In- structions" and "Electrical data" sec- tions.

^Finally, being careful not to scratch the chimney, push the cover plate up- wards until the spring fixing clips click into place. If installed correctly, the cover should be secure and flush against the ceiling.

^Before using the appliance remove the grease filter and remove the pro- tective foil from the filter frame. Re- turn filter.

30

Page 30
Image 30
Miele DA210-3 installation instructions Installation, Bolt the flange firmly to the ceiling us- ing the four M6 nuts