| Installation |
^ Screw the mounting plate through the |
|
ceiling and into the structural framing | ^ Using at least two people, lift the |
using 8 x 60 lag bolts and washers. | |
Once tight, make sure that the | hood and guide the spring clips |
mounting plate can safely support | through their respective slots in the |
the weight of the hood. | flange at the top of the chimney. |
| Make sure they click into place and that |
| the hood is hanging securely from the |
| spring clips before allowing them to |
| carry the weight. |
29