SECTION 4 − INSTALLATION
4-1. Specifications
Primary |
| Primary | Primary Service | Secondary | Secondary |
|
| Rated | Power | Max** |
|
|
| Cutting | OCV | ||||||
Volts |
| Amperes | (Recommended) | Volts (DC) | Amperes | KW | KVA | Capacity | Factor | (DC) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 0.25 in |
|
|
120 |
| 20.32 | 20A | 110 | 12 | 2.01 | 2.44 | (6.4 mm) | 0.82 | 335 |
| (0.25*) | At 6 IPM | ||||||||
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
| (2.5 mm/s) |
|
|
|
|
|
|
|
|
|
|
|
|
|
*While idling |
|
|
|
|
|
|
|
|
| |
**10% High line condition |
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
4-2. Specifications For Torch
35% duty cycle
Compressor output: 1.2 scfm (28.3 L/min) at 50 PSI (345 kPa) at 700 ft (213 m)
Safety interlock devices shut down power source
Safety trigger guard
Cutting capacity: see Section
4-3. Duty Cycle And Overheating
Duty Cycle is percentage of 10 min- utes that unit can cut at rated load without overheating.
|
| If unit overheats, thermostat(s) |
|
| opens, output stops, Temperature |
|
| trouble light goes On, and cooling |
|
| fan runs. Wait fifteen minutes for |
|
| unit to cool or temperature light to |
go off. Reduce amperage or duty | ||
cycle before cutting or gouging. | ||
|
| Y Exceeding duty cycle can |
| damage unit and void |
Overheating | warranty. |
|
0
15
Minutes
duty1 4/95 − 802