SECTION 3 – OPERATION
3-1. Controls
1
2
3
4
1Handle
2Wire Speed Control
3Pilot Light
4Spot Timer
5Optional Amperage and Volt- meter
6Power Switch
7Thermal Overload Pilot Light
810 Position Voltage Control
9Torch Connector
5
6
9
7
8
1
2
3
4
1Handle
2Wire Speed Control
3Pilot Light
4Spot Timer
5Optional Amperage and Volt- meter
6Power Switch
7Thermal Overload Pilot Light
810 Position Voltage Control
9Torch Connector
5
6
9
7
8