INSTALLATION
INSTALLING THE BAFFLE BRICKS
There are 2 brick retainer tube assemblies located be- low the ceiling of the firebox which require baffle brick before the stove can be operated. Install the baffle brick as follows:
1.Place the first three brick onto the brick retainers with the notch facing up and toward the front. Next, slide the three brick all the way to the right (as you face the stove. See top view illustration below).
2.Place the fourth brick on top of the three brick. Posi- tion it so the notch is facing up and pointing to the left.
3.Install the fifth brick and slide all the way to the left.
4.Rotate the fourth brick into position (notch to the front and facing up) until it drops into place.
IMPORTANT: The baffle brick requires periodic in- spection and replacement for proper operation. If the baffle bricks are fractured or crumbling, they should be replaced. Do not operate this appliance without the baffle brick properly installed.
TOP VIEW OF BAFFLE BRICK
SIDE VIEW OF BAFFLE BRICK
TYPES OF CHIMNEYS
The chimney is a vital part of your stove installation. A properly built masonry chimney or a properly installed factory built chimney will assure a consistent draft under a variety of weather conditions (a smoking stove is usu- ally caused by a chimney problem). The stove flue size is 6 inches (152 mm) diameter, which is approximately 28 square inches (711 square mm) minimum. The maximum flue size should be no more than
All chimneys must be installed as specified by local building codes and according to the chimney manufac- turer instructions (in the case of a factory built chimney). See the chimney manufacturer instructions for exact specifications. Factory built chimneys must comply with UL 103HT or ULC S629.
PAGE 8