Monte Carlo Fan Company 3ASR52XXD installation instructions Safety cable installation

Models: 3ASR52XXD

1 7
Download 7 pages 58.74 Kb
Page 3
Image 3
10Safety cable installation

7

Place canopy, canopy ring and then yoke cover on downrod. Thread leadwires and safety cable through downrod. As shown.

10Safety cable installation

Safety Cable

Lag Screw

safety cable

washer

3” Tighten the 2 set screws on the Yoke once the downrod is in place.lag lock screw washer

For Canadian installation and for USA fan and light kit combinations over 35 lbs, in both flush and downrod mode the safety cable must be installed into the house structure beams using the 3” lag screws,washers, and lock washers. provided. Make sure that when the safety cable is fully extended the leadwires are longer than the cable and no stress is placed on the lead- wires.

13

white black

Make wiring connections as indicated above. White from fan to white from remote marked N. Blue from fan to blue from remote marked light. Black from fan to Black from remote marked L. White from house to white from remote marked AC N . Black from house to Black from remote marked AC L. Connect all green ground wires to Ground wire from House.

16

Make wire connections to power source using wire nuts provided. Make sure that no filiments are outside of the wirenut. After making the wire connections, the wires should be spread apart with the grounded con- ductor and the equipment-grounding conductor on one side of the outlet box and ungrounded conductor on the other side of the outlet box.

8

Insert downrod into yoke on top of the Fan Body. Align the hole in the Downrod with the hole in the Yoke. Insert the Pin through the Yoke and Downrod until the point appears on the other side. Install the keeper to pin.

11

Make sure the studs protruding from the bottom of the Mounting bracket are installed with threads all the way through the bracket.

14

Remote Transmitter Dip swtiches

Remote Receiver Dip switches

Set dip switches on the Remote Transmitter and Remote Receiver to the same settings. This must be done so the units will communcate properly. If you have other fans you can set to control from one transmitter by setting both receivers the same as the transmitter. If you have more than one fan with remote. You can set the dip switches to different positiosns to have seperate control.

17

Next lift the cover ring and install knurled nuts as shown. Tighten the knurled nuts securely. The canopy should adjust for any irregularity in the ceiling or Outlet box.

9

Tighten the 2 set screws on the Yoke once the downrod is in place.

12

Hang assembled fan from the mounting bracket installed to ceiling in previous step. Make sure the fan is hanging straight. Rotate fan until the tab on the Mounting bracket engages the slot on the Downrod Ball. This must be done to prevent the fan body from rotating when the blades are in motion.

15

Slide remote receiver into mounting bracket.

18 Blade plate

Align the blade and then the blade plate with castings on motor to attach blades to motor.

Page 3
Image 3
Monte Carlo Fan Company 3ASR52XXD installation instructions Safety cable installation