ASSEMBLY/STARTING INSTRUCTIONS
9 | Plug power connector into |
| the Defender unit power |
| slot located on the back of |
| the power head. |
| 10 |
|
| Plug adaptor into properly |
|
|
| ||
|
|
|
| grounded electrical outlet. |
|
| |||
|
|
|
| This adaptor is not intended |
|
|
|
| to be mounted. For UL Listed |
|
|
|
| trap use 120 Vac adaptor. |
|
|
|
| For CE marked trap use 230 |
|
|
|
| Vac adaptor. |
|
|
|
|
|
|
|
|
|
|
| 11 |
|
| Turn propane on by slowly |
|
|
| ||
|
|
|
| turning counterclockwise. |
|
| |||
|
|
|
| Take care not to turn too |
|
|
|
| quickly to avoid engage- |
|
|
|
| ment of safety check valve |
|
|
|
| in regulator. |
|
|
|
|
|
|
|
|
|
|
CONTINUE
TO STARTING
INSTRUCTIONS.
9
TRAP PLACEMENT | |
1 | Determine the direction of the prevailing wind. |
2 | Stand in the center of the area you are trying to protect and look toward the prevailing wind. Proper |
| placement of the Mosquito Magnet will be |
| (i.e., bushes, flowerbeds, treeline, marshbed, etc.) |
3 | It is recommended that the trap be placed in the shade. |
4 | Do not place trap directly above water source (sprinklers, hose, etc.). |
5 | Make sure unit is not directly up against a blockade such as a building or fence. |
6 | Trap must be placed on level ground to avoid tipping or uneven propane distribution. |
7 | For more information, refer to trap placement section of our website at www.mosquitomagnet.com. |
STARTING INSTRUCTIONS
It is recommended that you read the entire manual before starting the Mosquito Magnet Defender
1 | Connect regulator to propane tank. |
2 | Plug power connector into the trap. |
3 | Plug AC adapter into electrical socket. To avoid the risk of electrical shock, connect only to properly |
| grounded outlets. Adaptor unit is not intended to be mounted. |
4 | Slowly turn propane tank on (turn valve counter clockwise). |
5 | Turn rocker switch to “on” position. |
6 | The red light on the switch will flash for up to 20 minutes (warm up phase). |
7 | Once the light stops flashing and is solid the Mosquito Magnet is fully operational. |
10