GA-6RZ2— PREPARATION FOR LONG -TERM STORAGE

GA-6RZ2— PREPARATION FOR LONG -TERM STORAGE

Generator Storage

For storage of the generating set for over 30 days, the following is required:

zDrain the fuel tank completely.

zRun the engine until the gasoline in the carburetor is completely consumed.

zCompletely drain the oil from the crankcase and refill with fresh oil.

zRemove the spark plug, pour 2 or 3 cc of SAE 30 oil into the cylinder and crank slowly to distribute the oil.

zSlowly rotate the engine a few times with the starter Rope and install a new plug.

zPull out the starter rope slowly and stop at the compression point.

zClean all external parts of the generating set with a cloth.

zCover the generating set and store in a clean, dry place.

PAGE 18 — GA-6RZ2 A.C. GENERATOR — PARTS & OPERATION MANUAL — REV. #3 (03/09/05)