Natural Gas
Supply Line
(not supplied)
Cylinder Retaining
Bracket
Manual Gas Valve (on/off)

7

ENCLOSURES FOR LP GAS SUPPLY SYSTEMS

WARNING! During the initial purging and subsequent lightings, NEVER allow gas valve to remain in the “Open” position without first placing and igniting the firestarter.

If you build an enclosure for an LP gas cylinder, follow these recommended specifications. You must also follow local codes.

Enclosures for LP gas supply cylinders shall be ventilated by openings at the level of the cylinder valve and at floor level. The effectiveness of the opening(s) for purposes of ventilation shall be determined with the LP gas supply cylinder(s) in place. This shall be accomplished by one of the following:

One side of the enclosure shall be completely open;

OR

For an enclosure having four sides, a top and bottom:

a)At least two ventilation openings at cylinder valve level shall be provided in the side wall, equally sized, spaced at 180 degrees (3.14 rad), and unobstructed. Each opening shall have a total free area of not less than ½ square inch per pound (3.2 sq. cm/kg) of stored fuel capacity and not less than a total free area of 10 square inches (64.5 sq. cm).

b)Ventilation opening(s) shall be provided at floor level and shall have a total free area of not less than ½ inch per pound (3.2 sq. cm/kg) of stored fuel capacity and not less than a total free area of 10 square inches (64.5 sq. cm). If ventilation openings at floor level are in a side wall, there shall be at least two openings. The bottom of the openings shall be at floor level and the upper edge no more than 5 inches (127mm) above the floor. The openings shall be equally sized, spaced at 180 degrees (3.14 rad) and unobstructed.

c)Every opening shall have minimum dimensions so as to permit the entrance of a 1/8 inch (3.2mm) diameter rod.

Cylinder valves shall be readily accessible for hand operation. A door on the enclosure to gain access to

the cylinder valve is acceptable, provided it is

QCC1

non-locking and can be opened without the

 

use of tools.

 

There shall be a minimum clearance of 2 inches (50.8mm) between the lower surface of the floor of the LP gas supply cylinder enclosure and the ground.

Propane Regulator

Hose

• The design of the enclosure shall be such that (1) the LP gas supply cylinder(s) can be

connected, disconnected and the connections

inspected and tested outside the cylinder enclosure; and (2) those connections which could be disturbed when installing the cylinder(s) in the enclosure can be leak tested inside the enclosure.

Be certain to mount or set the LP gas cylinder on a flat surface and restrain it to prevent it from tipping.

Purge the gas supply line of any trapped air prior to the first firing of the unit.

CYLINDER RETAINING BRACKET

1.Fasten the bracket to the bottom of the propane bottle using bolt and nut supplied.

2.Tighten the lag screw into the mounting surface leaving approximately 1/4” of thread above the surface.

3.Slide propane bottle into position so that the bracket slides under the head of the lag screw.

4.Tighten the lag screw onto the bracket.

5.For fastening to a concrete surface a concrete anchor will be required. (Not supplied)

SEE

THR

U

www.napoleonfireplaces.com

Page 7
Image 7
Napoleon Fireplaces N415-0232 operating instructions Enclosures for LP GAS Supply Systems, Cylinder Retaining Bracket