Manual background

Installation Guide for the 9 dBi Omni-directional Antenna ANT2409

3.Connect the grounding cable (not included) from the lightning arrestor to the ground of the building.

Grounding cable: The grounding cable must be equivalent or better than: AWG 10, UL 1015, Stranded, 600 V, 105 oC, green or green/yellow insulation, 2 clip of 5.5 mm inner diameter cramped at both ends, cable no longer than 5 meters.

WARNING: the lightning arrestor and appropriate ground cable must be used for outdoor installation. NETGEAR does not assume any responsibility in case of hazard resulting of non-compliance with these instructions.

4.Screw the N/SMA Reverse Adapter on the lightning arrestor (clockwise) on the second RF port. Connect a NETGEAR cable model ACC-10314-01, 02, 03, 04 or 05 (sold separately) to the adapter.

5.Locate the primary detachable antenna on the wireless access point. Remove the antenna and connect the other end of the NETGEAR cable ACC-10314-01, 02, 03, 04 or 05 to this port.

NOTE: On access points with two antennas, if you are only replacing one antenna, be sure to replace the primary antenna and do not remove the secondary antenna.

6.After attaching your new 9 dBi antenna(s), reconnect your wireless device to the network and turn them on.

2-4

Installing the 9 dBi Omni-directional Antenna

Page 16
Image 16
NETGEAR 2409 manual Installing the 9 dBi Omni-directionalAntenna