Installation Procedures

Prepare the Site

Before you begin installing your hub, prepare the installation site. Make sure your operating environment meets the operating environment requirements of the equipment.

Characteristic

Requirement

 

 

Temperature

Ambient temperature between 0° and 40° C (32° and 104° F).

 

No nearby heat sources such as direct sunlight, warm air

 

exhausts, or heaters.

 

 

Operating humidity

Maximum relative humidity of 90%, noncondensing.

 

 

Ventilation

Minimum 2 inches (5.08 cm) on all sides for cooling.

 

Adequate airflow in room or wiring closet.

 

 

Operating

At least 6 feet (1.83 m) to nearest source of electromagnetic

conditions

noise (such as photocopy machine or arc welder).

 

 

Service access

Minimum 12 inches (19.68 cm) front and back for service access

 

and maintenance.

 

Front and back clearance for cables and wiring hardware such as

 

punchdown blocks.

 

 

Power

Adequate power source within 6 feet (1.83 m).

 

 

Wiring hardware

Wiring hardware, such as punchdown blocks or patch panels,

 

should be complete before installing the hub.

 

 

Install the Hub

To install your hub on a flat surface, you do not need any special tools. Be sure the hub is positioned with at least 2 inches of space on all sides for ventilation.

To install the hub on a wall, measure the distance between the mounting holes on the back of the hub and mark the wall to match the location of the mounting holes on the hub. At the marked location, screw into the wall the two screws that you received with the mounting kit included in

your package contents. Be sure to choose a location that is near the devices to be connected, is close to an electrical outlet, and provides at least 2 inches of space all around the hub for ventilation.