NewAir APH-4000PV Operation, Minimum clearances, Preparation before lighting, Leak Checking

Models: APH-4000PV

1 15
Download 15 pages 21.61 Kb
Page 10
Image 10
2.2 Minimum clearances

2.2 Minimum clearances

Minimum 24” clearances from combustible materials must be maintained at all times while the heater is in operation.

3. Operation

3.1 Preparation before lighting

3.1.1Check any possible shipping damage of the heater. If any is found, immediately contact your selling dealer or call us directly.

3.1.2Please review thoroughly and be sure you understand all of the “safety precautions and warnings”.

3.1.3Make sure control knob is at “OFF” position.

3.1.4Place the LP cylinder onto the Cylinder Base. Connect the Regulator / hose assembly to the cylinder by rotating the Regulator’s hand wheel clockwise into the cylinder’s valve and securely tighten.

3.1.5If attempting to relight a hot heater, always wait until the heater is cool.

3.2 Leak Checking

￿

￿

Check all of gas connections in the heater with soapy water.

Apply soap solution to all propane connections, especially the fuel connections between the Regulator connection device to the Cylinder valve, the fitting at the end of the Fuel Line to the Burner Head and the other end of the Fuel Line to the Hose assembly.

Inspect all propane connections, look for bubbles.

If bubbles appear, there is a leak. Disconnect and reconnect, try again.

If no bubbles appear, the connection is safe, continue the next step: Lighting. If the leak persists, turn cylinder valve OFF and contact your selling dealer or call our Customer Service Dept. directly for assistance and advice.

Warning:

Perform Leak test outdoors only.

Never leak test when smoking.

￿Do not use a flame to check for leaks.

3.3 Lighting

3.3.1 To light the pilot

Lift the cylinder cover from the base and set it the stable position. Turn the cylinder valve on.

The first step is to purge the fuel line when a new or refilled propane cylinder is

￿installed.

Gently depress the control knob at the faceplate panel and rotate it to “PILOT”

10

Page 10
Image 10
NewAir APH-4000PV owner manual Operation, Minimum clearances, Preparation before lighting, Leak Checking, Lighting