INSTALLATION INSTRUCTIONSREAD & SAVE THESE INSTRUCTIONS!Heat-A-Vent®
Combination
MODEL: 9905
FOR BEST RESULTS
In a new construction site, install the housing (complete with heater and ventilator) during
Installation in an existing, finished building requires an accessible area (attic or crawl space) above the planned location. See “INSTALLATION IN EXISTING CONSTRUCTION.”
Do not install closer than 12 inches to a vertical surface. Do not install over tub or shower enclosure.
UNIT DIMENSIONS
Refer to Figure 1 for housing’s dimensions.
NOTE: If there will be a finished second floor above, the Model 9905 housing requires a minimum of 2" x 8" joist construction for mounting.
WIRING AND DUCTWORK
1.Run the required wiring during
2.Total connected load: 1630 watts.
3.Plan to run 120vAC, 60 Hz wiring (with ground) on a separate 20 Amp circuit from a power source, through the provided wall switch, to the housing’s junction box. See wiring diagram.
4.Use 4" round duct.
INSTALLATION IN
NEW CONSTRUCTION
PREPARATION
1.Loosen hanger bar brackets to allow bars to be inserted.
2.Refer to Figure 2. Insert hanger bars into brackets.
3.Refer to Figure 3. Slide hanger bar brackets down to end of slot closest to outside edge of housing. Tighten brackets in this position.
4.Refer to Figure 4. Remove junction box cover by removing one screw.
5.Refer to Figure 4. Remove appropriate wiring knockout(s) and install approved box connector(s).
93⁄4" |
73⁄4" |
14" |
FIGURE 1 |
| HANGER BARS |
| FIGURE 2 |
| VENT |
| JUNCTION |
| BOX |
| COVER |
| HEAT |
ADJUSTMENT |
|
SLOT |
|
FIGURE 3 | KNOCKOUTS |
FIGURE 4 |