NuTone 9905 installation instructions Installation In Existing Construction, Planning

Models: 9905

1 4
Download 4 pages 42.07 Kb
Page 3
Image 3
INSTALLATION IN

INSTALLATION IN

EXISTING CONSTRUCTION

In an existing, finished building, installation of the Heat- Vent Combination requires an accessible area (attic or crawl space) above the planned location. If the location that has been chosen for installation has a finished floor above it, be certain there is sufficient space available to install the housing and make the necessary duct connection.

PLANNING

Review “INSTALLATION IN NEW CONSTRUCTION” and follow all instructions that apply.

CAUTION: Check the area above the planned location to make sure that:

(1)Ducting can be installed or that the area is sufficient for proper venting.

(2)Wiring can be run to the planned location.

(3)No wiring or other obstructions might interfere with the installation.

INSTALLATION

1.The housing must be mounted between ceiling joists.

2.Refer to Figure 8. Mark ceiling for cutout.

Cutout dimensions: 1418" long x 978" wide. Make cutout in ceiling.

3.Follow steps under “PREPARATION” page 1.

4.From above, lower housing into the cutout and secure hanger brackets. Install duct collar, connect duct, and run wiring through box connectors.

5.From below, adjust housing so that it is flush with the finished ceiling.

6.From below, make wiring connections as shown in figure 6.

7.Replace junction box cover.

8.Insert heater and ventilator plugs into proper receptacles.

9.Install grille.

GRILLE

FIGURE 7

1418"

978"

FIGURE 8

Page 3
Image 3
NuTone 9905 installation instructions Installation In Existing Construction, Planning

FAQ

What is required for installation in existing construction?

For existing construction, the installation requires an accessible area in the attic or crawl space above the planned location. Ensure there is sufficient space available to install the housing and make the necessary duct connection.

What should be checked before installation?

Check the area above the planned location to make sure that ducting can be installed or that the area is sufficient for proper venting. Also, ensure wiring can be run to the planned location and that no obstructions might interfere with the installation.

How is the housing mounted?

The housing must be mounted between ceiling joists. Follow the specific cutout dimensions and steps for securing the housing in place.