Scupper Pro Rudder Installation Instructions (1997 or newer models)
This kit is designed for the Scupper Pro with rudder mount and notches, first shipped October 29, 1996, serial numbers greater than XKA11274. Your Pro must
also have the front and center hatches to allow acess to the hull for rudder installation.
| Ledge (for | Notch (vertical surface for | |||
| steering track) | ||||
14561 | tubing and steering lines) | ||||
| 2 | ||||
|
| 3 | |||
|
| ||||
|
|
| |||
|
|
|
|
| |
|
|
|
|
|
Notch (vertical surface for tubing and steering lines)
Rudder mount (insert nylon sleeve)
BOW | ||
|
| |
to install steering lines) |
Ledge (for |
| 1 |
|
| 4 | |
| ||||||
|
| Notch (vertical surface for | ||||
| ||||||
steering track) | ||||||
tubing and steering lines) | ||||||
|
|
|
6
STERN7
5
Notch (vertical surface for tubing and steering lines)
Parts Included:
1 rudder assembly (300386)
2 steering tracks with slides and pedals
(300107)
2 lengths of tubing (300153)
2 steering lines (300084)
1 nylon sleeve (300077)
4 long machine screws (300163)
4 well nuts (300162)
Drill Tubing Holes
1 clam cleat (300099)
1 strap eye (300048)
2
4
2 short machine screws (300110)
4 rubber grommets (300097)
Tools Needed: |
|
drill | hammer |
3/8” drill bit | small block of wood |
7/16” wrench | soapy water |
knife | duct tape |
phillips screwdriver | stiff wire (for TW) |
pen or marker |
|
1.You must first drill holes at the center of each notch (3, 4, 5, 6). Hold the drill at 90 degrees to the vertical surface of the notch, and hold it tightly to keep the drill straight through the layer of plastic.
2.Smooth any rough patches where you have drilled. Insert each of the 4 rubber grommets into each of the drilled notches. Tubing and steering lines will run through the kayak at these points.
Call your local dealer or Ocean Kayak if you have questions.