2.Preparation

Installing/Replacing the “AAA” size Batteries

1.Turn the main unit upside down.

2.Slide the battery cover in the

direction of the arrow while pressing the ribbed part of the cover.

3. Install or replace two “AAA” size batteries so that the + (positive) and - (negative) polarities match the polarities indicated on the battery compartment.

4.Put the battery cover back in place.

Slide the battery cover as indicated, until it clicks into place.

If the battery low symbol ( ) appears on the display, replace both batteries at the same time.

-When the battery low symbol ( ) starts to blink, you will still be able to use the unit for a short while. You should replace the batteries with new ones ahead of time.

-When the symbol ( ) remains lit, the batteries are exhausted. You should replace the batteries with new ones at once.

Remove the batteries if the unit will not be used for three months or more.

Dispose of batteries according to applicable local regulations.

Two new “AAA” alkaline batteries will last for approximately 1500 measurements, when used to take two measurements a day.

16

Page 16
Image 16
Omron HEM-SOLAR instruction manual Installing/Replacing the AAA size Batteries