Installation
20 900-0111-01-00 Rev A
Mounting Surface
M8 x 1.25 Stud
Lock Washer
Battery
Cable Lug
13 mm Nut
Flat Washer
Insulator
Figure 9 Required Order of Battery Cable Hardware
CAUTION: Fire Hazard
Never install extra washers or hardware between the mounting surface and the
battery cable lug. The decreased surface area can build up heat.
Install battery cable lug, nuts and washers in the
order illustrated. The battery cable lug should be
the first item installed on the stud. It should make
solid contact with the mounting surface. Do not
install hardware in a different order than shown.