Rack mounting

The unit can be mounted into a 19-inch standard rack if the optional rack-mounting adapters (AJ-MA75P) are used. For the installation rails, it is recommended that the rail and bracket for 18q length (model number CC3061-99-0400) of Chassis Trak be used. If an even greater clearance is to be left between the VTR and rack when the VTR is pulled out, however, it is recommended that the 22q long Chassis Trak (model number CC-3001-99-0191) be used.

(The complete slide rail and bracket unit is not available from Panasonic.) For further details, consult with your dealer.

1 Attach the inner members of the slide rails. Refer to Table 1 for the places where they are to be secured with the screws.

A B C D E F G H

Table 1 Locations where the screws are secured on right (R) side of inner members of slide rails

 

18q Chassis Trak

22q Chassis Trak

 

 

 

Part Number

CC3061-99-0400

CC3001-99-0191

 

 

 

Screw holes to be used

B, E, G

C, H

 

 

 

Attach the inner members at the same symmetrical positions on the left (L) side.

Note: The letters “A” to “H” are not actually marked on the side panels.

2

3

4

5

The length of the screws used is subject to restriction. Use screws which are less than 2/5q long in their place.

6 screws must be used to secure each inner member. When using the 22q long slide rails, secure the screws at 4 locations.

Attach the outer member brackets to the rack.

Check that the height is the same for the left and right brackets.

Remove the four screws at the front for attaching the left and right side panels.

Attach the AJ-MA75P rack-mounting adapters with included 4 screws.

Rack-mounting adapters

Remove the 4 rubber legs from the bottom of the unit, and install the unit in the rack. After the unit has been installed, check that it moves smoothly along the rails.

EIA standard rack

Fasten it to the rack with set screws.

<Notes>

Keep the temperature inside the rack to between +41°F (5°C) and +104°F (40°C).

Bolt the rack securely to the floor so that it will not topple over when the VTR is drawn out.

– 84 –