9-28

n Line Processing of Antenna Cable of Main Unit

㪉䌾㪌㫄㫄
㪇䌾㪈㫄㫄
Connect the gray antenna cable.
Connect the green antenna cable.
Connect the blue antenna cable.
Insert into the Clamper.
If poorly fixed, the Cable
catching may occur between
the Board and boss.
FPC connection
Insert it into the boss.
Push it downward from
the top of boss.
()
Step 2
Step 3
Step 1
Step 6
Step 4 Step 5
Audio PCB Ass'y
Step 8
Step 7
Step 10
Step 11
Step 9
Step 13
Step 13
Cable Process
Cushion
Cable(White-L)
Tape
Cable
(Black) Cable(Gray-S)
Screw
Cable
Cable Holder Cushion
Arrange all the cables (white, black, blue, gray and green)
to the arrow direction.
Pass blue, gray and green Cables through
under the FPC of AUDO Board.
Fix the blue and
Fix the blue and
gray cables with gray cables with
the Tape.the Tape.
Fix the blue and
gray cables with
the Tape.
Insert the FPC.
Insert the FPC.
Check Locking.Check Locking.
Insert the FPC.
Check Locking.
After processing the cables, inserting the FPC
and locking, incline the Audio PCB to the arrow
direction.
Confirm the Cables processed in Step 5 do not
exist under the Board, and then fix the Screws.
This is because Cable catching may occur
between the Board and boss.
Attach the cushion
to the side of rib.
Process the ANT
Cables.
(white and black)
Process the additional Cables
(white and black).
*Pass all the Cables through
under the Cushion attached in
Step 3.
Process the additional Cables
(white and black).
ޓMain Board side
Process the additional Cable (gray).
Screw
Ԙ
Screw
ԙ
Screw
Ԛ
Ԙ
Screw
ԙ
Screw
Ԛ
Screw
ԛ
Connect the additional cable (black).
CAUTION S1:Insulation S2:Bitten S3:Sharp Edge
S4:Part No. Check S5:Other Torque of tightening screw :0.2 ± 0.02N·m(2.0 ± 0.2kgf·cm)
S2
S2