Panasonic HQ-2243TH manual Suggested Tool Requirements, Preparation Of Chassis, Features

Models: HQ-2243TH

1 32
Download 32 pages 24.85 Kb
Page 11
Image 11
Suggested Tool Requirements

Suggested Tool Requirements

SCREWDRIVER(+, -), RULER, KNIFE, HAMMER, PENCIL, LEVEL

PREPARATION OF CHASSIS

1.Remove the screws which fasten the cabinet at both sides and at the back.

2.Slide the unit out from the cabinet by gripping the base pan handle and pulling forward while bracing the cabinet.

3.Cut the window sash seal to the proper length. Peel off the backing and attach the Foam-PE to the underside of the window sash.

Shipping screws

Fig. 1

4. Remove the backing from Foam-PE with 3 holes and attach it to the bottom of the Top retainer bar.

5. Attach the Top retainer bar on the top of the cabinet with 3 screws (Type A).

Fig. 2

Features

6.Insert the Frame guides into the bottom of the cabinet.

7.Insert the Frame Curtain into the Top retainer bar and Frame guides.

8.Fasten the curtains to the unit with 10 screws (Type A) at both sides.

 

Top retainer bar

Foam-PE

Foam-PE

Fig. 3

Top retainer bar

 

Screw

 

(Type A)

Screw(Type A)

Frame guide

Fig. 4

and Installation

11

Page 11
Image 11
Panasonic HQ-2243TH manual Suggested Tool Requirements, Preparation Of Chassis, Features, and Installation