(NOTE: Make; sure LATCABLEruns over top of bolts in TOP BOOM.)
FIGURE 14
STEP 14
¯ CAREFULLYlift ortilt the TOPBOOMand insert all GUIDERODSinto the bushings. See FIGURE14.
¯With the GLT[DERODS(1) securely held in the TOPBOOMTighten. all CABLEruns over the top of the bolts in the TOPBOOM.)
0
I I l I I I
II
TOPBOOMconnections. (NOTE:Makesure the
6