31

7

31

30

FIGURE 3

STEP 3:

Apply eight 1” SQ. GLIDES (31) to the inside of the CARRIAGE (7) as shown in FIGURE 3.

Attach one 1-1/4” SQ. RUBBER BUMPER (30) to the bottom of the CARRIAGE (7) as shown in FIGURE 3.

7

1

FIGURE 4

STEP 4:

CAREFULLY slide the CARRIAGE (7) over the UPRIGHT (1) as shown in FIGURE 4.

6

Page 6
Image 6
ParaBody 844 manual Step