11

 

3/8 x 3” 29

 

 

 

 

1

 

 

41

 

 

34

3/8 x 3-3/4” 30

 

 

 

 

42

24

 

 

FIGURE 16

21

34

 

36

STEP 16:

Refer to cable ILLUSTRATION “A” on page 14 for cable routing while installing pulleys.

[CABLE MUST BE POSITIONED BETWEEN PULLEY AND LOWER BOLT ASSEMBLY ON LEG PEDESTAL (11) AND FRAME (1)]

Securely assemble the ball end of the LOW CABLE (21) and one 3-1/2” PULLEY (24) to the LEG PEDESTAL (11) using two 3/8 X 3-3/4” BOLTS (30), two 3/8” X 1-1/16” FLANGE SPACERS (42), two 3/8” WASHERS (36), and two 3/8” LOCKNUTS (34).

(NOTE: The LEG CABLE (21) should be routed over the retaining bolt as shown in FIGURE 16.)

Securely assemble one 3-1/2” PULLEY (24) and two 3/8 X 3/4 FLANGE SPACERS (41) to the FRAME (1) using one 3/8 X 3” BOLTS (29), and one 3/8” LOCKNUT (34). (NOTE: The LEG CABLE (21) should be routed over the retaining bolt as shown in FIGURE 16.)

18

Page 18
Image 18
ParaBody GS2 manual X 3 X 3-3/4