2.If necessary to attach the cable connector firmly in place, replace the longer Telco cable captive screw with a shorter one. Fasten the connector.
3.Insert a cable tie (provided with Hotwire DSLAM) through the tie mount to hold the
4.Make sure the other end is connected to the appropriate MDF or demarcation point.
NOTE:
If connecting the Telco
Ferrite Choke (Installation in Hotwire 8820 GranDSLAM Only)
CAUTION:
All ferrite chokes that are supplied must be installed following these instructions to ensure compliance with FCC Part 15, VCCI, and CISPR22 rules.
"Procedure
A ferrite choke is included with all Hotwire 8775 and 8785 TDM SDSL Termination Units. The ferrite choke is only required if you install the termination unit in a Hotwire 8820 GranDSLAM; otherwise, it can be discarded.
To install the ferrite choke onto the
1.Open the ferrite choke and place it around the cable as close to the Hotwire 8820 GranDSLAM as possible.
2.Close the two halves around the cable and snap the choke shut, pressing down on the plastic latch to secure it.
3.Add a tie wrap if necessary to prevent the ferrite choke from slipping down the cable.
Ferrite Choke | Tie | |
Wrap | ||
| ||
Connector | Plastic | |
Latch | ||
End | ||
| ||
|
7