SmartNode 5200 Getting Started Guide

3 • SmartNode installation

 

 

Planning the installation

The mains outlet that is utilized to power the equipment must be within 10 feet (3 meters) of the device and shall be easily accessible.

Before installing the gateway router device, the following tasks should be completed:

Create a network diagram (see section “Network information” on page 21)

Gather IP related information (see section “IP related information” on page 22 for more information)

Install the hardware and software needed to configure the SmartNode. (See section “Software tools” on page 22)

Verify power source reliability (see section “Power source” on page 22).

After you have finished preparing for gateway router installation, go to section “Installing the gateway router” on page 22 to install the device.

Site log

Patton recommends that you maintain a site log to record all actions relevant to the system, if you do not already keep such a log. Site log entries should include information such as listed in table 4.

 

Table 4. Sample site log entries

 

 

Entry

Description

 

 

Installation

Make a copy of the installation checklist and insert it into the site log

 

 

Upgrades and maintenance

Use the site log to record ongoing maintenance and expansion history

 

 

Configuration changes

Record all changes and the reasons for them

 

 

Maintenance

Schedules, requirements, and procedures performed

 

 

Comments

Notes, and problems

 

 

Software

Changes and updates to SmartWare software

 

 

Network information

Network connection considerations that you should take into account for planning are provided for several types of network interfaces are described in the following sections.

Network Diagram

Draw a network overview diagram that displays all neighboring IP nodes, connected elements and telephony components.