Pelco C538M manual Installation, Communication Card, Pelco Manual C544M 2/98, DIP Switches

Models: C538M

1 17
Download 17 pages 15.69 Kb
Page 8
Image 8
3.0 INSTALLATION

3.0 INSTALLATION

To install the Pelco Infrared VCR Controller, proceed as follows:

1.Set the baud.

2.Set the start address.

3.Connect the CM9760-IRC to the CM9760-CC1 host.

4.Connect additional IRC units in daisy-chain fashion.

5.Connect VCRs to the Video Matrix Bay (CM9760-MXB).

6.Connect the IR control cables to the VCRs.

Each step listed above is detailed below:

3.1 COMMUNICATION CARD

The communication card (refer to Figure 4) has a bank of eight DIP switches used to do the following:

1.Set the operating baud of the unit

2.Set the start address

In Figure 5, DIP switch number 2 is ON.

COMMUNICATION CARD

Figure 4. Communication Card

Figure 5. DIP Switches

Pelco Manual C544M (2/98)

7

Page 8
Image 8
Pelco C538M manual Installation, Communication Card, Pelco Manual C544M 2/98, DIP Switches