3.2 MRU ASSEMBLY INSTRUCTIONS

3.2.1Hanger Assembly

1.Fit together the top bracket and the two side arms and place over the monitor/ receiver. Adjust each side arm equally outward to align the fastener holes. Using the four (4) 1/4-20 x 5/8 hex bolts, flat washers, lock washers and hex nuts supplied, fasten the arms to the top bracket.

2.Remove the monitor from the hanger assembly.

3.Thread the mounting pipe with the long-threaded section of pipe with hole for cotter pin into the top bracket, insert cotter pin, and tighten the 8-32 screw in the pipe nut to lock the pipe threads.

3.2.2Mounting the Hanger Assembly

NOTE: When determining the mounting location, consideration must be given to the total weight of the monitor and the mount. The mounting surface must be adequate to support this weight.

1.Determine the location for, and the type of mount to be used. Remember to allow for adequate clearance on all sides of the monitor.

2.Use the adapter mount as a template to mark the required mounting holes.

3.Using the necessary fasteners, attach the adapter mount to the chosen sur- face.

4.Thread the mounting pipe into the mount, stopping at the desired position, after the threads have become tight, approximately 30 ft lb. (If the MRCA or MRWA is being used, tighten the 8-32 screw in the pipe nut to lock the pipe threads.)

3.2.3Monitor Mounting

1.Align the holes in the side arms of the monitor bracket with the threaded holes in the side of the monitor/receiver.

2.Attached the monitor/receiver to the mount with the supplied fasteners

3.Tilt the monitor to the desired angle and tighten the fasteners.

4.Make all necessary electrical connections.

Pelco Manual C233M-G (8/95)

5

Page 9
Image 9
Pelco operation manual MRU Assembly Instructions, Hanger Assembly