3 SETTING AND FASTENING THE DOOR
A.Place three 3/8" beads of sealant. The first bead should be approximately 3/4" from the exterior of the rough opening, the second
TWO OR MORE PEOPLE WILL BE REQUIRED
FOR THE FOLLOWING STEPS.
B.Insert the door from the exterior of the building. DO NOT slide the bottom of the door into the opening. Sliding
will damage the sealant lines. Place the bottom of
the door at the bottom of the opening, then tilt |
|
the top into position. Center the door between |
|
the sides of the opening to allow equal clearance |
|
for shimming and insert one roofing nail in the | 3B |
first hole from the corner on each end of the top |
|
nailing fin. These are used to hold the door in place while shimming it plumb and square.
| 3A |
3B | Exterior |
|
C.Plumb and square door. Insert shims, as necessary, between the door and the sides of the rough opening starting up 6" from the bottom of the door.
Note: DO NOT over shim.
D.Check the interior reveal. Make sure the measurement from the interior face of the door to the interior face of the wall is equal at several points around the door.
Note: If the dimensions are not equal, check to make sure the fins are folded out to 90° at all points.
Interior
3C
3D
E.Secure the frame. Insert a 1" wide shim behind the pilot hole at the lock strike(s). Insert a #8 x
it passes through the shim and into the rough opening.
Note: The weather strip must be pushed aside to reveal the pilot
hole. Be careful not to damage the weather strip. Architect Series® and Designer Series® have 2 lock strikes, ProLine® has one lock strike.
mm20
1 | INCHES | |
| 30 | 40 |
|
|
2 |
|
50 | 60 |
|
70
3
shim
3E
3E
shim |
3F
F.Fasten the door to opening by driving 2" galvanized roofing nails into each
Note: Make sure the fin corner is lying as flat as possible.
ProLine Doors - Proceed to Step 4.