Installing Your LCD Monitor

Front View

Produt Description

Connecting to Your PC

Base

GettingStarted

OptimizingPerformance

Installing Your LCD Monitor

Front View Product Description

1

Automatically adjust the horizontal position, vertical position,

phase and clock setting.

 

2

UP and DOWN buttons are used when adjusting the OSD of your

monitor.

 

 

BRIGHTNESS hotkey. When the UP and DOWN arrow buttons

3

are pressed, the adjustment controls for the BRIGHTNESS will

 

show up.

4

OK button which when pressed will take you to the OSD controls.

 

LEFT and RIGHT buttons, like the UP and DOWN buttons, are

5

also used in adjusting the OSD of your monitor.

 

6

Power LED

7

POWER button switches your monitor on.

RETURN TO TOP OF THE PAGE

file:///D/My%20Documents/dfu/C_model/english/150c5/install/install.htm (1 of 3)2004-11-19 12:18:13 PM

Page 13
Image 13
Philips 150c5 user manual Installing Your LCD Monitor, Front View Product Description