PDP side hardware
Top side of the plasma display
4With the plasma display separated from the PDP side hardware by spacers, fix the plasma display to the hardware with bolt M8 (4 locations).
Use the hole marked with a red "%" as the standard.If the angle of incline is increased, the top of the angle adjustment use screw may be visible from a horizontal position on the front. In this case, you can hide the top of the screw by using the hole towards the top not marked with a red “%”.
For details see “Adjusting the Angle” on Page 12.Top side of the plasma display
Install the wall side hardware (4 locations) symmetrically on the left and right side (one at each location from the center of the ). Because the screws and bolts used to do this are different according to the wall strength and wall material, purchase suitable screws and bolts separately.
Note
Check the strength of the wall and beams before installing the display.
6Attach the hook on the ceiling side of the PDP side hardware to the wall side hardware.
1 First turn the screw in the center of the PDP side hardware in the direction that opens it to raise the tilted part then attach the hook so that the
attachment part is visible.2Attach the attachment part firmly, then check to make sure that the plasma display has been horizontally attached in the correct position.
Note
Do not hold the speakers during the installation work.
Note
If you plan to install speakers and cables, please install them at this stage.
Do not connect the cables to the other device.
For the speaker installation method, refer to the speaker installation procedure in the plasma display operating instructions or the under speaker operating instructions.
To install the under speaker in particular, first attach hang the plasma display on the wall with only the speaker installation hardware and the speaker cord attached, then attach the under speaker. Refer to the under speaker operating instructions for the method of attaching the speaker installation hardware and the speaker cord.
Hook
Opening
Closing
| Always have at least 2 people do this task. |
10 | Always make sure that the hook has been |
Caution hung. | |
En |
|