Porter-Cable D24938-044-2 instruction manual Before Each Start-Up, How to Start

Models: D24938-044-2

1 28
Download 28 pages 29.42 Kb
Page 16
Image 16
Closed Drain
Valve

6.Run the compressor for 20 minutes. Make sure the drain valve is open and there is minimal air pressure build-up in tank.

7.After 20 minutes, close the drain valve. The air receiver will fill to

"cut-out" pressure and the motor will stop.

The compressor is now ready for use.

Before Each Start-Up:

1.Place On/Auto/Off lever to "Off".

2.Pull the regulator knob out and turn counterclockwise to set the outlet pressure to zero.

3.Attach hose and accessories.

Risk of Bursting. Too much air

pressure causes a hazardous risk of bursting. Check the manufacturer’s maximum pressure rating for air tools and accessories. The regulator outlet pressure must never exceed the maximum pressure rating.

How to Start:

1.Turn the On/Auto/Off lever to "On/Auto" and allow tank pressure to build. Motor will stop when tank pressure reaches "cut-out" pressure.

2.Pull the regulator knob out and turn clockwise to increase pressure. When the desired pressure is reached push knob in to lock in place.

The compressor is ready for use.

D24938

16- ENG

Page 16
Image 16
Porter-Cable D24938-044-2 instruction manual Before Each Start-Up, How to Start