PORTABILITY KIT INSTALLATION
TOOLS REQUIRED: 7/16”, 1/2”, 9/16", and 5/8” sockets and ratchets, block(s) of wood (minimum of 6” tall).
Refer to the parts list on page 9.
WHEEL INSTALLATION
1.Block up end of generator opposite the fuel tank cap to install wheel kit.
2.Slide the axle (item 35) through the wheel brackets on the carrier, then through a wheel (item 31), with the offset side of the wheel hub against the wheel bracket.
3.Secure the wheel to the axle with the axle cap (item 16), tapping the cap onto the axle with a hammer.
4.Repeat above instructions for the remaining wheel.
FOOT INSTALLATION
1.Blocking up the engine side of the generator, place the foot bracket (item 27) under the carrier channel. Thread a
Caution: Do not over tighten so that the rubber foot material collapses.
HANDLE INSTALLATION
1.Place handle (item 28) over carrier tubing on same end as feet, centering handle on the carrier.
2.Slide 7/16 x 2” bolt (item 30) through handle as shown in diagram and secure with 7/16” nyloc nut (item 33). Tighten until handle is securely clamped to the carrier tubing.
3.Apply aerosol hairspray or similar adhesive to the handle (item 28), and then slide the handle grip (item 44) onto the handle. The aerosol hairspray will allow for easier assembly and will adhere the grip to the handle.
NOTE: When using a generator cover with this portability kit, the handle must be moved to the downward position.
Your generator is supplied with a 25 foot 12 GA SJTW
CORD SET
an
You will notice that the
|
|
|
|
English |
| 3 | |
|
|
|
|