BATTERY PLACEMENT AND | that the charger is connected by checking to see that it is | |
CONNECTION (cont.) | plugged into a powered GFCI receptacle, and that the | |
positive (+) and negative | ||
To install the battery, begin by placing the battery (A) | connected to their respective battery cables. | |
into the battery rack as shown in Fig G. Orientation of | LUBRICATION | |
the battery terminals is according to installer preference | ||
as the supplied battery cables are of adequate length to | Once all connections are made, the final installation | |
reach terminals regardless of battery direction. Secure | step is verification of proper engine oil level. The engine | |
the battery to the rack using the | is factory filled and shipped with approximately 1.5 qt | |
battery strap (D) packed in the literature bag packed with | (1.4 liters) of SAE | |
the unit, as illustrated by Fig G. | check by removing the dipstick (K), wiping it clean, then | |
FIG. G | reinserting it into the engine. Remove the dipstick a | |
second time, checking that the oil level falls between the | ||
| ||
| upper and lower limit marks (see Fig A ,page 26) on the | |
| end of the dipstick. Adjust engine oil level as required so | |
| the level is at the upper limit mark on the dipstick, adding | |
| oil to the engine through the oil fill cap (L) as shown in | |
| Fig H. |
FIG. H
K
| After the battery is tight in the rack, begin attaching |
|
|
|
|
|
|
|
|
the battery cables to the battery posts, starting with the |
|
|
|
|
| L | |||
positive (+), or red, cable (E). Loosen the bolt (F) on the |
|
|
|
|
| ||||
post clamp slightly to allow the clamp to expand, then |
|
|
|
|
|
|
|
| |
firmly push the clamp onto the battery post marked |
|
|
|
|
|
|
|
| |
positive (+) until the top of the post extends past the top |
|
|
|
|
|
|
|
| |
of the clamp. Rotate the clamp around the post as |
|
|
|
|
|
|
|
| |
required to insure the clamp cannot contact any metal |
|
|
|
|
|
|
|
| |
components, then tighten the clamp bolt (F) until snug. |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| ||
Finally,slide the post boot (G) down the cable and place |
|
|
| WARNING |
|
|
| ||
it entirely over the clamp. |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| ||
| Finish connecting the battery by placing the negative |
|
|
|
|
|
|
|
|
|
| • State and federal agencies have determined | |||||||
| |||||||||
negative |
| that contact with used engine oil can cause | |||||||
post extends past the top of the clamp, then rotate the |
| cancer or reproductive toxicity. Take care to | |||||||
clamp to avoid contact with any metal parts. Tighten the |
| limit skin contact and breathing of vapors as | |||||||
battery clamp bolt (I) until snug. |
| much as possible. Use rubber gloves and wash | |||||||
|
|
| exposed skin. | ||||||
| The final step of battery installation is to verify proper |
|
|
|
|
|
|
|
|
connection of all battery charger connections. A battery |
|
|
|
|
|
|
|
| |
charging system (J) is included with the engine/generator |
|
|
| CAUTION |
|
| |||
set to maintain the battery charge during extended |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| ||
| • Any attempt to crank or start the engine before | ||||||||
periods of generator inactivity, therefore providing |
| ||||||||
| it has been properly serviced with the | ||||||||
consistent starting. A quick check of charger |
| ||||||||
| recommended oil will result in an engine failure | ||||||||
connections will verify that factory connections are |
| ||||||||
| that is not covered by warranty. | ||||||||
correct so the charger can function as intended. Insure |
| ||||||||
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
17 |