Premier Mounts PBM-070L A B C, Installation Manual, Commercially Available Base Box, Page

Models: PBM-070L

1 9
Download 9 pages 47.91 Kb
Page 5
Image 5
A

PBM-070L

Ceiling Installation

Step 1. Separate the top bridge from the base box by removing the six (6) M6 x 12 mm screws that are located on the base box, three on each side (A).

Step 2. Secure the top bridge to the ceiling structure at this time (see warning label) using commercially available hardware (B). Step 3. Use the two (2) middle slot openings for single wood stud mounting. All other mounting points on the top bridge may be

used depending on your installation application (B).

Step 4. Replace the base box to the secured top bridge and secure with the six M6 x 12 mm screws (C).

A

B

C

 Ceiling Structure Wood Stud (Commercially Available)Manual backgroundManual background Ceiling Structure Wood Stud Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

Top Bridge

Manual background Lag Bolts

(Commercially Available)

Base Box

Installation Manual

Page - 5 -

Page 5
Image 5
Premier Mounts PBM-070L A B C, Installation Manual, Ceiling Structure Wood Stud Top Bridge Lag Bolts, Page