Premier Mounts PDS-PLUS Ceiling Installation - Solid Surface, Page, Installation Instructions

Models: PDS-PLUS

1 17
Download 17 pages 5.03 Kb
Page 8
Image 8
Ceiling Installation – Solid Surface

PDS-PLUS

Ceiling Installation – Solid Surface

Upper Bridge

M6 x 8mm Set Screw

Base Box

1.Separate the Upper Bridge from the Base Box by removing the six (6) M6 x 12mm Phillips head screws (three on each side).

Wood Ceiling Stud

Ceiling Surface

Mounting Slot

Upper Bridge

#14 x 2”Wood Screws

2.Use the appropriate slot openings for single wood stud mounting, depending on your ceiling configuration. The adjustable channel slots on the upper bridge plate will allow you to fine tune the final orientation of the projector.

3.Secure the Upper Bridge to the center of the stud on the ceiling structure at this time using two (2) #14 x 2” wood screws (supplied).

Page - 8 -

Installation Instructions

Page 8
Image 8
Premier Mounts PDS-PLUS installation manual Ceiling Installation - Solid Surface, Page, Installation Instructions