Proline PLFW581, PLFW582 Preparation, Inspect Range Hood, Tools YOU’LL Need, Prepare Ductwork

Models: PLFW582 PLFW581

1 20
Download 20 pages 33.75 Kb
Page 11
Image 11

USER MANUAL  7

PREPARATION

INSPECT RANGE HOOD

1. Check contents of box:

range hood

wall or ceiling mounting bracket small bag of hardware

chimney (only on certain models)

support brackets (only on certain models) transition duct (only on certain models)

2. Test

plug in and test controls, lights, fan

inspect for any damage during shipping

you must report any damage to Proline within 7 days for a refund

TOOLS YOU’LL NEED:

power drill screwdrivers drill bit

tape measurer marking pencils

duct tape aluminum backed level

wall anchors (Make sure to buy the right kind. Hardware stores can help.)

PREPARE DUCTWORK

Ductwork should already be punched through celling (or the wall if ceiling is not an option) and ready to hook up to the range hood before beginning installa- tion. See venting requirements on page 9 of this user manual.

Page 11
Image 11
Proline PLFW581, PLFW582 manual Preparation, Inspect Range Hood, Tools YOU’LL Need, Prepare Ductwork